1. Project Background:
A highway bridge pile foundation project is located in a complex terrain area, featuring mountains, rivers, existing highways, communication lines, and high-voltage power lines. External grid connection is extremely difficult, and overhead or buried cable routing is costly and impractical.
2. Key power demand characteristics:
High total power consumption, with overlapping operation of high-power equipment such as pile drivers, demanding robust load capacity;
The site adopts a diesel-storage hybrid smart power station (diesel generator + energy storage) as an alternative to conventional standalone diesel generator sets.
3. Smart Power Station Configuration:
Configuration: 2 × 200 kW diesel generators + 1 energy storage system
4. Load & Consumption Data:
|
Item |
Value |
|
Average load power |
315.9 kW |
|
Hourly energy consumption |
315.9 kWh |
|
Daily operating hours |
12 h |
|
Daily energy consumption |
3,790.8 kWh |
|
Monthly working days |
28 days |
|
Monthly energy consumption |
106,100 kWh (≈106.1 MWh) |
|
Construction period |
12 months |
|
Total energy consumption over project |
1,273,700 kWh (≈1,273.7 MWh) |
5. Fuel Consumption & Cost Comparison (Diesel price: 7 RMB/L)
|
Metric |
Conventional diesel-only |
Diesel-storage smart station |
|
Diesel generation efficiency |
1.7 kWh/L |
2.5 kWh/L |
|
Total diesel required over project |
749,000 L |
509,000 L |
|
Total diesel expenditure |
5.245 million RMB |
3.566 million RMB |
6. Benefits Summary
Under identical total energy consumption:
7. Scenario Value Proposition
Name: Mr. Zhang
Mobile:8613222235952
Tel:8613167199094
Whatsapp:8617315222516,8613167199094
Email:skyzhang@podprefab.com
Add:Room B1701, Building 4, Dongfang Xintiandi, Yangshe Town, Zhangjiagang, Suzhou City, Jiangsu Province, China